When to go paper/site. Phase 2 of the 2010 earthqn/rs2 project is now available. phase 2 is a comprehensive stress analysis software for the analysis of rock excavation designs. It is designed specifically for the analysis of those operations that are projected to affect the stability of the overlying rock mass, but which are not intended to result in significant damage to the rock mass.
In this case, the specifications were to excavate a small cone in a relatively soft rock mass that was too thin and weak to support the overlying rock mass after excavation. Stages of rock excavation. Rock excavation generally begins with a cut face. This cut face is then further partitioned into areas that are to be excavated using various types of excavation equipment.
It is common to have to excavate several
May 21, 2018
The following model-based materials are supported by RS2 : (1) rock masses. A 2D elasto-plastic finite element model for detailed analysis of the effects of rock excavation with a limited model history. (2) drilled hole geometry. A 2D elasto-plastic finite element model for detailed analysis of the effects of drilled hole geometry with limited model history. (3) composite element . A 2D elasto-plastic finite element model for detailed analysis of the effects of concrete-structure interaction with a limited model history. (4) frost heave . A 2D elasto-plastic finite element model for the analysis of frost heave.
May 13, 2018
May 12, 2018
May 11, 2018
May 10, 2018
May 09, 2018
May 08, 2018
A JW asROCK. A JW asROCK analysis and design system.
Oct 12, 2017
Underground excavation (UG) is required where the existing rock mass is removed or where the existing geomembrane is
Dec 07, 2013
Phase 2 is now available.
Nov 27, 2013
"Rock technology" is another term used to describe rock engineering and rock mass analysis in the commercial sector. It is often used as a synonym to rock engineering, as in "rock technology" or "rock engineering". It can also refer to the science and engineering of rocks and rock mass.
It is
Feb 26, 2013
Feb 25, 2013
Phase 2 is now available.
Feb 18, 2013
Feb 13 be359ba680
Related links:
Comments